Case Study 1 – Mr & Mrs F, Stourbridge
We were contacted by Mr & Mrs F as they initially wanted solar PV to generate electricity for daytime usage. They requested an Enphase system due to it’s key features: per panel optimisation and superior safety.
Having monitored their production for 2 months, we then returned to install them an Enphase battery to integrate with their system.
The System – A Brief Overview
Installed capacity of PV system
5.95 kWp
Level of self sufficiency
59.08%
CO2 emissions saved
1,121 kg / year
Battery
Enphase IQ Battery 5P 5.0 kWh